⛔ Assembling Process of Transformer ‼️
🔸 The transformer assembly process involves multiple stages to ensure proper installation, reliability, and safety. Below is a step-by-step guide to the transformer assembly process:
⭕ Preparation Phase:
➡️ Inspection of Components:
✅ Check core, windings, bushings, tank, conservator, cooling systems, and accessories for defects.
➡️ Site Preparation:
✅ Ensure the area is clean, level, and has a proper foundation.
➡️ Tools and Equipment:
✅ Ready essential tools like wrenches, torque tools, and lifting devices.
⭕ Core and Coil Assembly:
➡️ Core Placement:
✅ Position the core as per design; ensure it is clean and dry.
➡️ Winding Installation:
✅ Install windings carefully, maintaining insulation and alignment.
➡️ Fastening:
✅ Secure core and windings with clamps to prevent movement.
⭕ Tank Assembly:
➡️ Tank Placement:
✅ Position the transformer tank properly. Inspect the tank for cleanliness and dryness.
➡️ Lowering Core-Coil Assembly:
✅ Carefully lower the core and coil assembly into the transformer tank using lifting equipment.
➡️ Sealing:
✅ Apply gaskets to prevent oil leakage, and seal the tank lid securely.
⭕ Bushings Installation:
➡️ Mount Bushings:
✅ Attach high-voltage and low-voltage bushings to the tank.
➡️ Connection:
✅ Connect the bushings to the corresponding internal windings.
⭕ Cooling System Installation:
➡️ Radiators and Fans:
✅ Attach radiators or cooling fins to the transformer tank. Install fans or pumps for forced cooling systems.
➡️ Oil Circulation:
✅ Ensure proper piping for oil circulation in the cooling system.
⭕ Conservator and Breather Installation:
➡️ Conservator Tank:
✅ Mount the conservator tank above the transformer main tank.
➡️ Breather:
✅ Connect the silica gel breather to the conservator to ensure moisture-free breathing.
⭕ Oil Filling:
➡️ Degassing:
✅ Degas the transformer oil to remove moisture and impurities.
➡️ Filling:
✅ Fill the tank with transformer oil under vacuum conditions to prevent air pockets.
➡️ Top-Up:
✅ Ensure the oil level matches the recommended level.
⭕ Electrical Connections:
➡️ External Connections:
✅ Connect cables or busbars to high-voltage and low-voltage bushings.
➡️ Grounding:
✅ Ensure proper grounding of the tank and core.
⭕ Testing:
➡️ Insulation:
✅ Conduct insulation resistance tests (e.g., Megger testing).
➡️ Polarity & Ratio:
✅ Verify turns ratio and polarity.
➡️ Leak Check:
✅ Inspect for oil leaks and tank integrity.
⭕ Finalization:
➡️ Accessories:
✅ Install temperature gauges, oil level indicators, and relays.
➡️ Inspection:
✅ Verify assembly and functionality.
➡️ Commissioning:
✅ Energize the transformer and monitor operation.
⭕ Safety Considerations:
✅ Follow the manufacturer's manual and guidelines.
✅ Use appropriate safety gear and protocols.
✅ Comply with electrical standards and codes.