MMEP Tools
Blog/Changelog/Ceiling Coordination Studio 1.0.0: first stable release
LOG-005· Changelog · ceiling-coordination-studio

Ceiling Coordination Studio 1.0.0: first stable release

Plan, route, and auto-arrange above-ceiling MEP services in one workspace — Ceiling Coordination Studio's first stable release.

MTMEPTools Dev · Platform team·18 Jul 2026·1 min read

Ceiling Coordination Studio (MEP-02) hits 1.0.0. It’s built for the layer of coordination that happens above the finished ceiling — ducts, cable trays, and pipework fighting for the same void.

What it does

Plan and route above-ceiling MEP services, then validate the layout against clearance and coordination rules before it’s a clash discovered on site. Auto-arrange takes a first pass at resolving routing conflicts so the starting layout isn’t a blank canvas.

Getting a layout out

Right now export is PNG, JPG, and JSON — a snapshot and the raw project file, not yet a CAD or BIM interchange format. DXF/IFC exchange is on Plant Room Studio (MEP-01) today; whether Ceiling Coordination Studio gets the same treatment depends on how this first release gets used.

Mobile

Like Plant Room Studio, phones and narrow viewports open the tool as a read-only viewer — full navigation, no editing, built for reviewing a layout rather than drafting one in the field.

next ›Duct Pressure Drop Calculator 1.0.0: first stable release